I arrived at the farm around 6:30 and resisted the urge to take a nap. Instead I put down the rest of the screws on the porch. It was boring and tedious, but thankfully now finished. Next I organized the tools inside the house and set up my two new scaffolding sections. The will come in very handy for putting the siding on the front of the house and installing beaded board on the ceilings. The HVAC guys came to start on the duct work and I talked with them briefly. I went to the roofing/insulation supply place, but the office was locked. I’ll return next week to speak with them about insulating the house. After a late breakfast I went by the Cub Cadet dealer and briefly looked at lawn mowers. They had some nice ones, but it’s hard to get excited about spending so much money. Back at the farm I just loaded up the cardboard boxes from the scaffolding and hit the road. I could have done some cleaning up outside, but it was really so muddy that I didn’t feel like walking around in it. There was also a chance of thunderstorms, although I don’t think those ever materialized. I’ll be back down tomorrow.