This morning I went to the lumberyard for a bundle of 2x12s and then started cutting them, along with some 2x8s at the job site. My dad came a little later and we started installing joists on one of the front porches. The mud slowed us down a bit but we still made good progress. My dad installed blocking between the joists while I cut more for the back porch. By the time he left we had all of the joists and blocking installed on the bigger of the two front porches. I left not long after and returned to the cottage for a shower. I drove home in the rain and arrived to play with Luke a bit before dinner. He was in a good mood and did well cleaning up after we ate.