We got to the job site about seven again this morning and started off on the front porch – the most difficult and challenging element of the whole house. It was pretty high up and I did not enjoy being on the ladders. It took us about two hours and I was glad to be done. We also did more on one side of the house, and started up the back wall as well. That area was a muddy mess, but we still made good progress. I had to run out for nails, safety glasses, and water, otherwise we worked without stopping. It started sprinkling a little after two so we packed up and returned to the cottage. Glad we did because it really started pouring. I showered, took trash to the dump, then headed home. The drive was uneventful. Liz and Luke were outside when I arrived. I played Legos with Luke until dinner. We had pie for dessert and he was thrilled. He did better than usual at bed time.