The excavator texted about seven this morning to say he was on the way, so I headed on to the job site. I did some last minute preparations and they showed up about eight with a tracked skid and mini-ex. I showed them the layout of everything and they started moving dirt, a lot of it. One site was close to level and the other wasn’t. So they were able to level one up, but the other will have two steps in the footings. One of the guys and I went to lunch at the Goat Market and after that I laid out the footings and they dug. That took until about four. I left there, went back to the cottage to pack up, then drove home. My parents were there when I arrived, and everybody was finishing up dinner. Luke stretched out bath and bed time and I have been reading a little. It was a draining day.