It was supposed to be super cold this morning, and I wasn’t at all motivated to get out of bed and start the day. I didn’t get to the job site until ten. Then my compressor wasn’t working, so I had to get my backup from the storage unit. It was very difficult to maneuver around the house with all the materials in the way, but eventually I got in a groove. I knocked out the ceiling trim and some base trim in the bedrooms and flex room, trimmed out the closets, and finally finished the edges of the vaulted ceiling. I did another stretch of flooring in the main room, and started setting out the cabinets. That was nice to help visualize things. I finally wrapped up around nine and returned to the cottage.



