There were a couple of inches of snow on the ground, and I was in no rush to get going this morning. After breakfast I did load some shiplap onto the roof rack and headed to the job site. It was still snowing a little and was extremely cold. I finished the shiplap on the vaulted wall and started on the bathrooms. Both of those went pretty slowly. I had to go to the cottage for more shiplap, which I precut and hauled inside my car. I unloaded it, tidied up the house, and returned to the cottage to do a little work. Then I hooked up the flatbed trailer and drove home. I was able to spend about 20 minutes with Luke before he went to bed.