Well, the inspector came out first thing this morning and approved us. I went on a run/hike after that but kept getting interrupted with phone calls. I lined up the termite guy and the excavators had the concrete set. I waited for both at the job site starting at around 11:40. The sprayer arrived a little after two and the concrete closer to three. I had to run down to Manchester, and by the time I returned the crew was leaving. I checked things out, paid my bell, and left very happy. Now I need to email the block guy to get him all lined up. I decided to go photograph at Lake O’Donnell, which was glorious, and then at the Templeton Library, which was also amazing.


