Today was a bit of a disaster. The plan was basically just to clean up a little bit, pack my tools and some leftover materials, then head to the farm. I arrived to the project at 6:30 and the countertop guys were getting there as well. I helped them bring in the granite, and we discovered the first problem of the day – the granite slab and the cabinets did not align. Long story short, I had to take up a lot of flooring and then we spent considerable time adjusting the cabinets. This was just in unit one. In unit two we took up the cabinets and cut them so they will move more freely and we can hopefully adjust them without taking up any more flooring.
Other issues included the footings guy hitting electrical conduit, the porch guys leaving without doing any work, and a general sense of chaos as deliveries were being made all at the same time. On the bright side, I got all of the flooring put back down and the bathroom vanities look great. But I worked until 5:15 and there is more yet to do tomorrow. Hopefully I will be able to get down to the farm early afternoon.
Luke had just finished nursing when I returned to the condo and so we played together and did tummy time.