I slept in a little and didn’t get to work until about 6:30. On the bright (literally!) side I saw the sun reveal itself as a beautiful orange ball as I was driving through the AG Center. That was worth stopping for. But not worth unearthing the real camera, apparently. I started putting flooring down in the ground level of unit four. It went pretty well for the most part. At about eight Liz texted to see if I could come back to the condo around one in order to look after Luke for the afternoon. So I worked until twelve and then left. I am pretty pleased with my progress considering the reduced time, But I will definitely have to work hard the rest of the week in order to catch up. I’m hoping to be finished with all of the flooring by Saturday.